Civil: Oneonta Municipal Airport, Oneonta, NY
Project Summary: Entrance Relocation and Drainage Project
Eastman Role: Prime Contractor
Project Overview: Mass excavated 60,000 cubic yards within an active fly zone. This required moving material from the south end of the runway to the north end of runway, crossing 2 approaches while maintaining clean and accessible runways at all times for air traffic. The project also relocated the entrance road and installed drainage structures.
|