Ultra Dairy Garelick Farms |
|
Completed an 85,000 sq. ft. cooler warehouse which included concrete work, masonry, roofing, metal studs, drywall, interior finishes and winter protection. Also constructed a wastewater pre-treatment plant. This included all wastewater process piping, installation of all equipment, constructed concrete aeration tanks, blower building, concrete Clarifier, sludge tanks and bio towers. Projects also included all related site work and paving. |
|
Installation of manholes. |
|
Site Work |
|
Preparing for Roof Installation |
|
Preparing for the installation of pre-cast concrete roof planks. |
|
Blower Room |
|
Two 1,020 CFM blowers assisting two 520 CFM blowers for the plant operation. |
|
Nearly Completed Pre-Treatment Plant |
Delhi, New York |
June, 1 2003 |
|
Contact Information: |
|
Phone: (607) 432-7803 Fax: (607) 432-8140 |
|
Bio-Tower and pre-treatment building in the final stage. |