Ultra Dairy Garelick Farms

Completed an 85,000 sq. ft. cooler warehouse which included concrete work, masonry, roofing, metal studs, drywall, interior finishes and winter protection.  Also constructed a wastewater pre-treatment plant.  This included all wastewater process piping, installation of all equipment, constructed concrete aeration tanks, blower building, concrete Clarifier, sludge tanks and bio towers.  Projects also included all related site work and paving.

Installation of manholes.

Site Work

Preparing for Roof Installation

Preparing for the installation of pre-cast concrete roof planks.

Blower Room

Two 1,020 CFM blowers assisting two 520 CFM blowers for the plant operation.

Nearly Completed Pre-Treatment Plant

Delhi, New York

June, 1 2003

Contact Information:

Phone: (607) 432-7803

Fax: (607) 432-8140

Bio-Tower and pre-treatment building in the final stage.