Kraft Foods

For over 15 years, we have been an integral part of the numerous ongoing construction projects taking place at Kraft Foods.  Constructed a reverse osmosis facility, complete ammonia accumulator installation with associated piping, construction of Silo alcoves including installation of multiple 65,000 gallon milk silos complete with mass foundations.  Completed dip room addition and alterations, installed complete state-of-the-art chemical bulk storage and transfer facility.  Relocation of Silos, equipment and all associated appurtenances from closed facility in Ohio to Walton, New York.  This included all related construction services.  Over the years, we have provided a multitude of construction related services that have both met and exceeded their corporate goals.

Waste Water Treatment Plant

Rehabilitation of waste water lagoon.  Installed new PVC liner.

Office Building and Truck Garage

Milk Silo Removal

37,000 lbs. silos being prepared for removal.

Whey Plant Roof Repair

Removal of existing damaged structural roof and replacement with new structural components and new EPDM roofing.

Heavy Rigging

Walton/Edmeston/Sherburne, New York

In Progress

Contact Information:

Phone: (607) 432-7803

Fax: (607) 432-8140

500 ton crane and 90 ton crane in preparation for silo removal.

Constructed addition onto existing office space.